Production 2007
Molipop 26-03-07 to 1-06-07
Project 2 28-04-07 to 20-06-07
Project 3 30-05-07 to 22-06-07
Project 4 12-06-07 to 12-07-07
Project 5
Project 6
Project 7
Project 8
Molipop 2 December 2007
Production is very smooth due to the planing and completed design document. For me as
the artist on a project I just have to work from the number 01 folder down to the 10 folder
making all the art look good. For the programmer I hope the design document helps to give
them a clear picture of the game to be coded. With each
new game we like to make our
design documents more clear and better. A good design document is something to be very
proud of.


Below is our production time frames for the first and second half. We have overlap as the
artwork is completed before the Coding. We have two artist in Silkjade so we can produce a
solid set of artwork fast.